Wembley Stadium achieves 52% energy savings with Autoflame Service & Support boiler room upgrades
Thank you for your interest in our work at Wembley Stadium. Click the button below to read and download the case study.
In a groundbreaking partnership with the FA and Wembley Stadium, we have successfully implemented innovative upgrades to the stadium’s gas-fired boiler plant.
By installing high-efficiency Limpsfield burners and Autoflame Mk8 Controls, we have optimised the building management system (BMS) to minimise boiler cycling. This resulted in a remarkable 52% reduction in monthly gas consumption and ROI less than a year.