Wembley Stadium achieves 52% energy savings with Autoflame Service & Support boiler room upgrades

Thank you for your interest in our work at Wembley Stadium. Click the button below to read and download the case study.

In a groundbreaking partnership with the FA and Wembley Stadium, we have successfully implemented innovative upgrades to the stadium’s gas-fired boiler plant.

By installing high-efficiency Limpsfield burners and Autoflame Mk8 Controls, we have optimised the building management system (BMS) to minimise boiler cycling. This resulted in a remarkable 52% reduction in monthly gas consumption and ROI less than a year.

Download the case study to learn how our energy saving solutions can help your facility achieve significant cost reductions and pave the way to a more sustainable future.

Service Engineer checking readings on Autoflame Mk8 screen
Close up Autoflame Mk8 screen and Limpsfield burner front glas
Wide angle view of three Limpsfield burners an Autoflame Mk8 controls at Wembley Stadium
Service Engineer checking readings on Autoflame Mk8 screen

“In 2023, we upgraded our heating systems with high-efficiency Limpsfield burners and Autoflame controls, reducing annual energy usage by 52% and achieving a return on investment in under 12 months. Despite rising post-COVID-19 energy prices, our costs remain below pre-COVID-19 levels due to reduced gas usage and optimal burner sequencing, thanks to Autoflame Service & Support’s outstanding technology and service.”

– John Stirrup, Technical Manager, Wembley Stadium.